Constant volume damper
Commissioning Air Systems (BG 49/2015), written by Chris Parsloe and published by BSRIA in March 2015, explains how to commission ducted air distribution systems in buildings. It was originally published in 2013 and was then updated in 2015.
It states: ‘Constant Volume Dampers (CVD's) work by means of a damper pushing against a pre-calibrated piston or spring device. The higher the velocity pressure acting on the face of the damper, the more the damper closes to restrict flow. The result is a constant flow rate provided that the pressure differential across the device is within the manufacturer’s stated minimum and maximum differential pressure limits. The required flow rate can be set and locked using the dial provided.’
--BSRIA
[edit] Related articles on Designing Buildings
Featured articles and news
Biodiversity net gain, tips and tools for small sites
How to deal with BNG when options become limited.
Registered building inspectors
Building types and conflicts of interest updates explained.
A brief run-down reminder of key points to note.
BSRIA's commitment to sustainability and net zero
Key documents that represent an early shift in thinking.
A resource for Cleaner Air, Better Tomorrow.
Awe-inspiring medieval great barns.
A history of timber construction in the UK
From a timber Stonehenge to half timber houses.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.